Assembly Principles. The 3T Method Only
WHEN BUILDING A TOWER
- To comply with the 3T method assemble with platforms every 2 metres in height, and, the locating of guard rails on both faces of either individual platforms or fully decked levels.
USE. Always wear suitable safety clothing (hard hats, gloves, non-slip safety boots) when using the tower.
Never climb tower with oil or grease on boots.
Do Not oil the castor wheels.
Keep tower components well painted or use galvanized towers. Inspect tower components before erection, do not abuse or use damaged components. Move towers by manual effort only from base but never move towers with personnel, equipment or materials on board. Take care when moving towers over rough ground. Always ensure that all locking collars, castor wheel locks and adjustable leg bolts are tightly tightened before using the tower. Locking collar bolts should be tightened to a torque of 5lbs/ft minimum and 8lbs/ft maximum. (Do not over tighten).
Beware of high winds. Do not attempt to work on towers in high winds. Beware of live overhead electric cables, moving parts of machinery and never erect towers in locations where they might be struck by vehicles.
TRANSPORTATION/STORAGE. Dismantling the tower should be carried out by following the assembly guide in reverse. When dismantling, pass or lower components down to a colleague, never throw or drop the parts since they may be damaged. Transport components with care, store under cover or inside to prevent corrosion.
GUARD RAILS/TOE BOARDS. All scaffold platforms from which a person could fall must be fitted with guard rails, double guard rails and toe board sets. Including intermediate rest platforms. It is recommended that guard rails and double guard rails are used as the towers is erected.
SCAFFOLD COUPLERS: The advanced Apex range of towers can be used with standard BS1139 couplers fitted over tubes. The Summit range can be used with standard couplers, fitted over the collars. Do not use ladders or boxes to achieve extra height.